Give wastewater service and building authority their own fields
On the intake sheet, record the site address, building permit authority, wastewater service, who confirmed the service, and the date. Use one of three service entries: public sewer confirmed, septic confirmed, or verification pending. Attach what you relied on. If the owner mentions county water and an old septic record turns up, leave wastewater service pending and assign someone to verify it before the proposal goes out.
Record the health permit decision
For a verified city or county public sewer connection, record the evidence for the connection and that Cobb & Douglas Public Health exempts the property from its residential pool construction permit. For confirmed septic, assign someone to submit the completed application to Cobb Environmental Health with a scale drawing showing the pool, deck, and associated structures. Track permit issuance and completion of any related septic work before releasing pool construction. If the pool requires a septic system modification, track its separate permit as well.
Match the drawing revision to the permit packet
Where Cobb County handles building permitting, use the county's in-ground site plan requirements for an in-ground fiberglass shell. Its residential pool checklist calls for the proposed design to be signed and sealed by a Georgia-registered land surveyor, professional engineer, or landscape architect. For a septic property, the checklist also requires Environmental Health approval in the county permit packet. For an address inside a city, confirm the building permit office and its current site plan requirements before assembling the packet.
Record the date and reference for the Environmental Health approval alongside the revision of the scale drawing used for review. If the shell moves, flag the new revision and ask Environmental Health which drawing it needs and whether the change requires further review before you rely on the approval for the permit packet.