Skip to content
Red Clay Pool Journal
Standard editorial article   /   Georgia

Check Cobb Septic Review Before You Order a Pool Shell

Use your Cobb property's septic records to compare fiberglass pool sizes and decide when to commit to a shell and layout.

Editorial desk   ·   2026-11-24
A swimming pool with lounge chairs and blue umbrellas on a stone patio
Photo by Clay Banks on Unsplash

Match the shell quote to the drawing reviewed by Cobb Public Health

Before committing to a fiberglass pool shell for a Cobb County home on septic, ask your builder for the dated property drawing reviewed by Cobb & Douglas Public Health and any written response from the department. Match the shell model and dimensions in your quote to the layout on that drawing. Ask which unresolved items could still change the shell size or placement. If review is still pending, ask which decisions you can keep open until the department responds.

For a home on septic, the department asks for a completed Residential Swimming Pool Construction Permit Application and a scaled property drawing showing the pool, deck, and associated structures. Give your builder any septic records you have and flag locations you still need to verify. If your home is served by city or county public sewer, the department's residential pool construction permit does not apply. Check with the building authority for your address about any separate building permit requirements.

Compare two shell sizes on the same property drawing

Ask the builder to sketch your first-choice shell and a shorter alternative on the same scaled property drawing. Have them show the proposed deck, equipment location, and installation access route for each option alongside the known septic features. For example, a shorter shell might free up room at one end while both layouts still rely on the same access route. Ask the builder to verify that route before choosing a shell, so you know whether the shorter model resolves a placement issue and whether installation access remains open.

Decide when to order and when construction can start

Ask which deposit reserves design time and which commits you to a specific shell. Use the drawing and the department's response as a purchasing checkpoint before authorizing the order. If the builder proposes moving or rotating the shell, ask whether the revised layout needs another review and how the change could affect delivery.

For construction on a Cobb County septic property, Cobb & Douglas Public Health requires a separate permit for any septic system modifications needed to accommodate the pool. The department must issue its residential pool construction permit and any related septic work must be finished before pool construction starts.

Sources