Skip to content
Red Clay Pool Journal
Standard editorial article   /   Georgia

Compare Cobb County Fiberglass Pool Quotes Through the First Swim

Compare Cobb County fiberglass pool quotes through the first swim, including permit and inspection costs, yard restoration, the initial fill and startup.

Editorial desk   ·   2026-11-24
A swimming pool with lounge chairs and blue umbrellas on a stone patio
Photo by Clay Banks on Unsplash

Set the same first-swim endpoint for both bids

“Pool installed” can leave you with a filled shell and a stack of fence panels. Give each bidder the same checklist for a pool you can use. Include the finished route from the house, the pool barrier, the working pump, restoration of any access opening, and startup service with confirmation from the provider that the water is ready for swimming. Ask each bidder to mark every item as included in the base price, priced separately or owner-paid.

Ask each bidder to identify who will obtain any applicable permits, who will arrange required inspections and who pays the associated fees. Ask the building authority which inspections or approvals, if any, must be completed before you use the pool at your address. Ask each bidder which inspection or approval records they will hand over and who will handle any remaining steps.

Price septic review and yard restoration for your lot

If your Cobb County property uses septic, ask Cobb & Douglas Public Health about its residential pool construction permit before settling on deck dimensions. The department asks for a scaled drawing that shows the pool, deck and related structures. Homes on city or county public sewer are exempt from that department’s pool construction permit. Direct building permit questions to the building authority and give both bidders the same parcel and wastewater information.

Where an access lane crosses lawn, ask bidders to break out removal, hauling, soil preparation and restoration. Have each one specify how many square feet they’ll restore. If one bid covers only the equipment lane and the other also covers the staging area, ask both to price the same marked area before comparing totals.

Price the first fill and compare the full cost

Ask each bidder how many gallons they expect the first fill to take, whether the water will come from your meter or a water supplier, and who pays for it. If Cobb County’s policy applies to your account, the initial fill receives no credit and the county bases wastewater billing on metered water use. Give the estimated volume to the providers that bill your property and ask how much the fill would add to your water bill and, where applicable, your wastewater bill.

Make one comparison row per bidder with four entries: base bid, separately priced work, owner-paid costs and required items still unpriced. For example, if one bidder leaves the first fill to you, enter the estimated utility charges or the water supplier’s quote under owner-paid costs. If the other bidder includes the fill in the base price, record it there and count it once. Add the first three entries to get each bid’s priced total. If a required item such as access-lane restoration still has no price, list it in the fourth entry, record who will confirm the cost and mark the total provisional until every required item is priced.

Sources