Skip to content
Red Clay Pool Journal
Standard editorial article   /   Georgia

Who Pays to Move Sprinklers Out of a Pool Footprint?

Compare pool bids by tracing which sprinkler zones need to stay and getting relocation, restoration, and payment terms in writing.

Editorial desk   ·   2026-11-24
A swimming pool with lounge chairs and blue umbrellas on a stone patio
Photo by Clay Banks on Unsplash

Start with the zones you want to keep

Take your pool drawing to the yard and point out the areas you still want watered after the job. An irrigation zone can serve several planting areas, so ask your irrigation contractor which parts of the system cross the proposed work area and what they serve. Georgia 811 lists irrigation among the private utilities its members do not locate. Agree with the pool builder on who will arrange to identify the affected lines before work begins.

Compare what each bid buys

Suppose the new deck replaces two sprinkler heads, but the same zone also serves a hedge you plan to keep. One bid might cover taking the two heads out of service. Another might also cover restoring water to the hedge and repairing disturbed lawn. Ask each builder to price the same outcome. If a bid assigns irrigation work to you, get a separate quote from your irrigation contractor so you can compare the total scope.

Name the payer before signing

Ask for a written line item that names who hires the irrigation contractor, who pays for the agreed work, and who verifies that the retained zones operate afterward. If the line route is still unknown, agree on who will present the revised scope and who must approve any extra charge. Put that decision alongside the pool schedule so both trades know when their part of the work is due.

Sources