Define what the owner means by replacement
Ask why the existing pool is being replaced, what the owner expects to keep, and who is paying for the work. Request the old plan, shell identification, repair history, and any written warranty decision before pricing. Walk the site with the owner and identify which deck sections, fence panels, and equipment they expect to see restored or reused. If the owner expects a manufacturer to supply the replacement shell, ask for written confirmation of what is being supplied and who is arranging delivery.
Assign the Georgia 811 ticket and private locates before excavation
Name who will submit the Georgia 811 ticket and who will check the responses before excavation. Georgia 811 members mark the public facilities they own. Georgia 811 advises homeowners to hire a private locator for private lines. Agree who will hire the locator for the work area and who will get the results to the crew. Ask about pool equipment power, irrigation, and septic lines. If the owner remembers a line feeding an old pool heater but cannot show its route, record who will arrange the locate and when you need the results to confirm the bid scope.
Before work begins, have the responsible excavator review Georgia 811’s full safe-digging requirements, check the ticket status, follow the applicable instructions for any outstanding responses or marking issues, and confirm that the agreed private locate is complete. If the crew sees signs of an unmarked utility before or during excavation, have them hold or stop excavation and follow Georgia 811’s current instructions before proceeding, even if all ticket responses are in.
Price the work through the agreed finish
Spell out who handles removal, haul-off, equipment reconnection, initial fill, and restoration of surfaces disturbed for access. Ask the local permitting office what it needs for the proposed replacement and assign responsibility for applications and inspections. Where reuse depends on a later assessment, name the item and explain how the owner will review and approve a scope change. That gives both sides a way to handle a failed reuse assumption before the next trade is booked.
