Skip to content
Red Clay Pool Journal
Standard editorial article   /   Georgia

How to identify Georgia amendments on an Athens-Clarke pool plan

Check which pool code edition governs an Athens-Clarke fiberglass pool plan and trace confirmed Georgia amendments to the details they affect.

Editorial desk   ·   2026-11-24
A swimming pool with lounge chairs and blue umbrellas on a stone patio
Photo by Clay Banks on Unsplash

Confirm the pool code edition on the cover sheet

Athens-Clarke lists the 2024 International Swimming Pool and Spa Code with Georgia Amendments among its locally adopted codes effective January 1, 2026. For a fiberglass pool job governed by that adoption, check that the cover sheet names the full code and edition. If you’re revising an earlier permit, give Athens-Clarke Building Permits & Inspections the permit number and ask which edition and Georgia amendments govern the revision before changing the code notes.

The county listing confirms the code edition and local adoption date. It leaves individual provisions and amendment dates to the code documents. Follow the county’s link to the Georgia Department of Community Affairs for those documents, and verify any effective date for the amendment you intend to cite separately from the county’s January 1, 2026 adoption date.

Resolve an older gate citation on sheet A-2

Suppose the cover sheet for a job governed by the county’s 2026 adoption names the 2024 pool code with Georgia Amendments, but the gate detail on A-2 cites an older edition. The county listing supports the cover-sheet entry. To resolve the discrepancy on A-2, check the gate feature cited in the callout against the applicable base section and the Georgia amendments for that edition.

If you need help confirming the comparison, send Building Permits & Inspections the permit number, the A-2 detail and the existing callout. Ask which base section applies to that gate feature, whether a Georgia amendment changes it for this permit, and, if so, which amendment citation and effective date to record. Once verified, replace the old reference beside the gate callout with the applicable citation. If the confirmed wording also affects a dimension or hardware note shown on A-2, revise that item where it appears.

Reconcile the corrected detail across the sheet set

Before reissuing the plans, search the set for the old edition, the pool code abbreviation and repeated gate notes. Compare the cover sheet, site plan and A-2 so the code summary and any notes pointing to the gate detail agree with the corrected callout.

In the revision log, record the affected sheets, the provision verified for A-2 and what changed. If the gate geometry and hardware notes stayed the same, log the change as a citation correction. If the check led to a drawing change, name the dimension, note or feature that changed so the office and field crew can find it.

Sources