Compare Georgia fiberglass pool bids with different allowances

Two Georgia bids can quote the same fiberglass pool and cover different work. Normalize patio, hauling and restoration allowances before choosing a contract.

Editorial desk   ·   2026-11-24
a pool with chairs and a table by it with flowers on the side
Photo by Karol Chomka on Unsplash

Which Georgia installation bid buys the same finished yard for less? In this invented example, both firms quote a Claremont. A asks $64,000 for 200 square feet of patio and two disposal loads, with no lawn restoration. B asks $67,000 for 300 square feet, three loads and restoration. To match B, add 100 square feet at A’s $18 per foot ($1,800), a $550 load and $900 for the lawn. A now totals $67,250. B is $250 lower on this scope. If the quotes name different shells, settle that difference before doing the math.

  1. Claremont · Latham Pool

    Latham lists the Claremont’s outer dimensions at 14 by 33 feet. On both Claremont bids, circle the point where the installer’s paving price starts. Ask how many square feet are included and the price per additional square foot. Enter the two numbers separately on your sheet.

  2. Reflection 33 · Leisure Pools USA

    Leisure lists the Reflection 33 at approximately 33 feet long and 12 feet 6 inches wide, measured at the widest outside edges. Ask for a Claremont quote on the agreed scope as well as the Reflection alternate. Have the bidder show how its narrower width changes coping length and paving area. Check whether excavation, hauling and restoration quantities also change.

  3. Aspen 14 × 35 · Thursday Pools

    Thursday Pools gives the Aspen 14 × 35 outside dimensions of 14 feet wide by 35 feet long. The separate 5-foot-5-inch figure describes its depth. Obtain the separate Aspen price on the same written scope. Have the bidder mark those extra two feet on the Claremont plan, then show the revised coping, patio, excavation, disposal and lawn repair quantities. Keep the alternate separate from the same-shell bid total.

Check who is making the bid

Georgia’s Secretary of State provides an online professional license lookup. Ask each bidder for its contracting name and any applicable license number, then check the entry. Get written confirmation that the bidder can supply the selected shell and install it at your address.

Obtain a revised total in writing

Give both firms the quantities for your selected shell. For every exception record the unit, included quantity, unit price and person who can authorize additional work. Ask for a dated replacement bid showing the full total and the exclusions that remain. Keep any different shell on a separately priced alternate.